Am I eligible for the Smart Export Guarantee (SEG) scheme?

You can apply for our SmartGen Smart Export Guarantee tariff if you own a small-scale renewable generator in Great Britain, it’s certified, and you have a meter that records your exports every half hour. Here’s the full checklist.

Quick eligibility check

You can apply for a ScottishPower SEG tariff if you can answer yes to all of the following:

  1. You own the generation system, and it’s installed in Great Britain
  2. It uses an eligible renewable technology (see below)
  3. Its total installed capacity is 5MW or less for all technology types apart from micro combined heat and power (micro-CHP), which must be 50kW or less.
  4. The system is certified by MCS, Flexi-Orb, NICEIC, NAPIT or an equivalent scheme, and was fitted by a certified installer
  5. The system is connected to the electricity network, with an export agreement in place with your Distribution Network Operator (DNO)
  6. You have a meter that can measure your exported electricity every half hour (an export meter, smart meter or AMR meter) and you’re happy for us to take those readings
  7. You’re not receiving Feed-in Tariff (FIT) export payments, and you’re not claiming SEG from another supplier for the same installation

You don’t need to buy your electricity from ScottishPower to receive SEG payments from us — although it does affect which tariff you’re offered.

Our SmartGen SEG tariffs reward customers for exporting excess electricity generated by their solar panels back to the grid. We offer a range of SmartGen tariffs, including our enhanced SmartGen Premium option for ScottishPower electricity customers, and our highest export rate SmartGen Premium Plus for ScottishPower electricity customers who installed their solar panels and/or battery with us.

Which technologies are eligible?

  • Solar PV

  • Wind

  • Hydro

  • Anaerobic digestion (AD)

  • Micro combined heat and power (micro-CHP), 50kW or less

Your meter

Your meter needs to be able to record the electricity you export in half-hourly intervals. That usually means a smart meter, an AMR meter, or a separate export meter.

You’ll also need an export MPAN (meter point administration number). If you’re applying for the first time and not switching from another supplier, we’ll arrange for your DNO to create one for you.

A few other conditions apply to your meter:

  • It must be an approved meter type that meets Ofgem’s metering standards

  • It must only be connected to your eligible installation (and any other accredited SEG installations at the same property)

  • It must be somewhere we, Ofgem, or anyone we authorise can safely get to it, so it can be inspected if needed

  • Keeping it in working order is your responsibility

Proving you own the system

You need to own the generation system to claim SEG payments. If the system is on a hire purchase or conditional sale agreement, the person in possession of it under that agreement counts as the owner.

We accept the following evidence of ownership:

  • If you’ve installed the system, a copy of the invoice or receipt stating the system has been paid in full.

  • If you’re in a new build, a letter from the property builder stating the installation was included with the purchase of the property.

  • If your renewable system was in situ when you purchased a property and wasn’t installed by you then you can submit a solicitors letter, mortgage statement or land registry certificate showing you as the owner.

If you’re a tenant

Tenants can apply, but you’ll need:

  • Written permission from your landlord or local council confirming you’re allowed to receive the SEG payments

  • Proof of ownership of the panels (your landlord or council will usually provide this)

  • A valid MCS or Flexi-Orb certificate (again, from your landlord or council)

  • A meter capable of recording exports every half hour

Extra requirements for anaerobic digestion (AD)

If your installation runs on anaerobic digestion, you’ll also need to:

  • Send the Anaerobic Digestion Declaration form to Ofgem
  • Get an email from Ofgem confirming your reporting start date.

  • Send quarterly and early sustainability reports to Ofgem.

  • If your system is bigger than 1 MW, you’ll also need to provide an annual sustainability audit report.

  • Confirm to us each year, on the anniversary of your AD Reporting Start Date, that your installation details are still correct

If we don’t have your AD Reporting Start Date, or you can’t show Ofgem’s reporting and sustainability requirements are being met, we won’t be able to make payments.

Ready to apply?

Once you’ve checked you meet the criteria, prepare your documents (your MCS, Flexi-Orb or equivalent certificate, proof that you own the system, a photo of your meter, and your bank details) and start your application.

Last updated: 13 November 2026


Was this information helpful?